First built in the 1940s, the City of Stoughton Wastewater Treatment Plant (WWTP) has undergone several expansions and upgrades to replace aging equipment, accommodate an increasing population, and to remain compliant with discharge permit requirements. Wastewater collection and treatment service consists of one treatment plant, three inverted siphons, six lift stations, over 69 miles of sanitary sewer mains, and over 1,600 manholes. All operations, including remote locations, are monitored and controlled by a supervisory control and data acquisition (SCADA) system.

The Wastewater Treatment Plant currently processes approximately one million gallons of wastewater per day. As the raw wastewater goes through the treatment plant, it is treated and cleaned so it can be safely discharged into the environment. The Stoughton Wastewater Treatment Plant uses an activated sludge treatment process. As wastewater moves through the plant, it is treated biologically, without chemicals, utilizing microorganisms that use the pollutants as a food source to break down waste material.

All aspects of the wastewater treatment process are closely monitored and regulated by the Wisconsin Department of Natural Resources (DNR). Wastewater operators regularly test samples of the wastewater to ensure safety and compliance with all applicable laws and permit limits.

The Wastewater Treatment Plant also reports daily weather observations such as temperature, precipitation, and snowfall measurements to the National Weather Service.

Stoughton’s Wastewater Treatment Process